Dealer Requirements

Six things stand between you and your own Cricket store.

None of them are a fee. Most operators arrive with three or four already in hand — and the ones you're missing are exactly what the first conversation is for. Here's the full list, with no surprises later.

6
Requirements, total
$0
Franchise fee
~30 days
Approval to open

About you

Every owner and principal on the application

About your business

The entity that signs and operates

About your location

Every site goes to Cricket for approval
Key takeaway

Four of these six have real Ping support behind them — the entity, the site, the checks, and the capital. Arriving with gaps is normal. Arriving with none of it is still a conversation worth having.

Ping Exclusive

Short on capital is a conversation, not a no.

Every approved location gets its buildout funded. That is a Ping Exclusive Incentive — available only when you build with us, and never a loan against your store. For operators with the drive but not the bank balance, the Ping Funding Tier goes further still.

Always included

The buildout is on us

Site survey, fixtures and furniture, install, exterior signage, training, and the grand opening. Every approved location, every operator. Your capital never touches the build.

Funding Tier — by qualification

We front the working capital

For qualified operators, Ping fronts the working capital too — opening inventory, payroll, and the rent runway — so the right person is not kept out by timing.

The result

Open with zero out-of-pocket

You bring the operator. Ping brings the capital, carries the lease, and runs the back office. You run the floor and keep the residual.

Funding Tier placement is determined during underwriting and is not guaranteed. Buildout support is part of the Cricket Dealer Lite program and is subject to Cricket approval and program terms, including the three-year lease commitment. Markets, locations, and program terms are subject to Cricket review and change at Cricket's sole discretion.

What happens after you apply

Five steps. Roughly thirty days from approval to a certified open store.

1

Apply

Submit the dealer package. A Ping rep reaches out within one business day.

2

Underwrite

Background, credit, entity, and a no-conflict check, all in one pass.

3

Site & lease

Location goes to Cricket for approval. Lease executes in Ping's name with the Cricket rider.

4

Build

Funded buildout, fixtures, signage, and your team's training.

5

Open

Grand opening, first activation, and compensation begins.

Not sure you qualify?

That is the most common reason people call, and it is the easiest one to settle. Fifteen minutes tells you where you stand and what your market looks like.